Rochester Bridge Trust News

  • All
  • 2023
  • 2024
  • 2025
  • Bridge Engineer's Blog
  • Heritage Collection
  • Traffic Notices
All
  • All
  • 2023
  • 2024
  • 2025
  • Bridge Engineer's Blog
  • Heritage Collection
  • Traffic Notices
1857 8 RE work to remove Medieval Bridge 1

Bricks reveal a glimpse of history

The bridge we have today is a reconstruction of the Victorian bridge designed by Sir William Cubitt and the structure now revealed would have been built at the same time ...
Read More
A general view 2

Behind the workshop wall

As passers-by will know, the facing wall at the Strood end of the bridge has now been taken down. As would be expected with any restoration work, it’s revealed a ...
Read More
Traffic Article Holder

Enforced closures of Rochester bridges

To facilitate Medway Council’s resurfacing works in Strood, there will be two overnight closures of the approach roads to the Rochester bridges. On Monday, 14th March, there will be no ...
Read More
Blog6 blue 1

Sourcing the right bricks for the workshop walls

In order to sympathetically replace the bricks in the workshop walls, research has been done to source the most appropriate materials. Two of the sample panels are pictured here. Photo ...
Read More
blog5 wall 1

How will the public be affected by works to the workshop wall?

The works to replace the workshop walls – which will begin imminently – are due to take place over several months. There should be minimal disturbance to the public and ...
Read More
blog4 end of wall 1

Replacing the wall – explaining Option 3

As the most aesthetically pleasing option – and the one most likely to obtain listed building consent – the removal and reconstruction of the whole wall was chosen as the ...
Read More

News Archives