Skip to content

Kennet and Avon Canal

Overview

By Sue Threader

By 1723, the small river Kennet which joined the Thames near Reading, had been made navigable upstream to Newbury. Five years later, the Bristol Avon was canalised from Hanham Mills – its tidal limit – as far as Bath. These developments raised the possibility of joining the two navigable rivers by means of a canal section to establish a navigable inland route between Bristol and London to avoid a sea voyage around the tip of Cornwall, although it was not until the late 1780s that plans to create what became the Kennet and Avon Canal began to develop in earnest and a committee was formed to survey a route for the canal. The initial proposal on a circuitous route was regarded as too expensive and there were doubts about the sufficiency of the water supply. In 1793 steps were taken to appoint a new engineer and the committee chose John Rennie who proposed a more direct route through Devizes, Trowbridge and Newbury.

Rennie’s route was shorter but necessitated building a system of locks to climb the very steep Caen Hill and a pair of sizeable aqueducts which he conceived on a resplendent scale, in a style that shows all his characteristic design-flair. The canal opened in 1810 after 16 years of construction, including the building of many locks and small bridges. The spectacular flight of 16 Caen Hill Locks was the last part of Rennie’s scheme to be completed.

The Kennet and Avon is a broad canal, varying from 40ft to 44ft in width and nominally 5ft deep. The canal section is 57 miles (91km) long, joining River Avon at Bath, via Devizes and Hungerford, to River Kennet at Newbury. It rises 404ft 6ins from Bath to the summit level 15 miles away and 450ft above sea level; then falls 210ft to Newbury. There are 79 locks, five masonry aqueducts (four original, one added later) and three tunnels. The Bruce Tunnel – a Rennie design – is over 500 ft. long and is the canal tunnel with the second largest cross-sectional area of any remaining open to navigation in Britain. Numerous overbridges were built in stone, brick, cast-iron and timber as well as three pumping stations at Claverton and Crofton as well as wharves and depots at Bradford-on-Avon. Nine hand-operated timber swing bridges were built to Rennie’s designs, each with ball-bearing pivots.

The Kennet and Avon was joined near Limpley Stoke by the Somerset Coal Canal (1801) and the Wilts and Berks Canal (1810), traces of which have now almost disappeared. At first highly profitable, the opening of the Great Western Railway in 1841 caused a rapid decline in the canal’s fortunes and traffic declined until by the end of the nineteenth century through traffic had ceased and the canal eventually fell into disuse. In recent years the Kennet and Avon Canal Trust, in cooperation with the British Waterways Board and Canal and River Trust have carried out considerable restoration work and the route is again navigable.

Dundas and Dundas and Avoncliff Aqueducts

By Victoria Owens

By 1723, the small river Kennet which joined the Thames near Reading had been made navigable upstream to Newbury. Five years later, the Bristol Avon was canalised from Hanham Mills – its tidal limit – as far as Bath. Strangely, although these developments raised the possibility of establishing a navigable inland route between Bristol and London, it was not until the 1780s that plans to connect the two waterways by canal began to develop in earnest.

On 29 July 1788, a newly formed canal committee under chairman Charles Dundas, 1st Baron Amesbury, commissioned engineers James Barnes, Samuel Simcock and Samuel Weston to survey a route linking the canalised Avon with the Kennet Navigation. The trio proposed a circuitous connection which took in Bradford-on-Avon, Melksham, Laycock, Chippenham, Calne, Calston, Marlborough and Hungerford, climbing 157ft 6in over 26 locks on its way before plunging into a 3442 yard tunnel through Calstone Hill. Concerns about the scheme’s expense and the adequacy of the water supply encouraged Dundas’s committee-men to seek a new surveyor.

They chose John Rennie who explored a number of alternative routes. In 1794, Parliament authorised a line from Bath to Newbury by way of Bradford-on-Avon, Trowbridge, Devizes, Great Bedwyn and Hungerford. By crossing the River Avon at Avoncliff and then re-crossing it near Monkton Coombe, Rennie not only cut a corner but also kept the canal on a level course between Bradford Lock (no 14) and Bath Top Lock (no 13) and avoided having to bridge the River Frome and Midford Brook. Nevertheless, his short-cut necessitated building a pair of sizeable aqueducts.

He conceived them on a resplendent scale, in a style that shows all his design-flair. At 150 yards (137.2m) long, the Dundas Aqueduct near Monkton Coombe has a hemispherical central arch with a span of 65 feet (19.8m) and elliptical side arches of 20 feet (6.1m) span. Framing them are revetments – wing-walls – which slope somewhat, buttressing the aqueduct on each side; pairs of vast pilasters flanking the central arch and single pilasters bordering each revetment. A wide cornice crowns a Doric frieze which runs the length of the aqueduct, extending over each pilaster. Made up of alternating triglyphs – tablets showing triple vertical grooves – and metopes – plain rectangular spaces- the frieze lends the Aqueduct a neo-classical flourish, befitting its proximity to the City of Bath.

Dundas Aqueduct from the east 2018 © Victoria Owens

An early drawing indicates that it is built on inverted arches – a foundation used upon ground that has little weight-bearing capacity and does not allow for deep excavation, and where the load borne by the structure –with an aqueduct it will be great – is concentrated over its walls. Building inverted arches required considerable skill and was apt to be costly, not least because of the need to install cofferdams – enclosures on the river bed which could be pumped out and kept (relatively) dry –for the labourers to work in. Unsurprisingly perhaps, although contractor James McIlquham undertook to build the aqueduct above waterline level, no-one tendered to build its foundations and the work had to be done by direct labour.

George Rennie’s sketch of his father’s Dundas Aqueduct, showing the foundations. Courtesy of the Institution of Civil Engineers and the Smeatonian Society
A mason’s mark at deck level of the Dundas Aqueduct 2018. The railway is just visible at the aqueduct’s western end © Victoria Owens

At 110 yards (100.6m) long, the aqueduct at Avoncliff is smaller but equally characterful. Its central arch spans 60 feet (18.3m) and the side arches are both 34 feet (10.4m) across. The cornice has a block-bracket design which extends along the curving abutment walls. Like the haunches of the arches, they are built in contrasting courses of smooth ashlar masonry and rougher rusticated stone blocks. Cutwaters rising to deck-height serve as buttresses while the balusters along the approaches enhance the structure’s elegance.

Avoncliff Aqueduct seen from the south 2018. The railway is just out of sight, beyond the northern wing-wall © Victoria Owens

Avoncliff’s central arch sags – not greatly, but perceptibly nonetheless. Most probably the trouble resulted either from an over-hasty contractor’s removing the centring on which the aqueduct was erected before the mortar had fully hardened or that the porous limestone, set in place amid frosty conditions, became friable at an early stage.

Avoncliff Aqueduct 2021. The sagging stone-courses emphasise the distortion of the central arch © Victoria Owens

Recognising that difficulties with crumbling masonry caused expense and delay, in 1803 Rennie urged the canal proprietors to build in brick rather than stone. They dismissed his suggestion out of hand – not for aesthetic reasons, but because they wished to preserve friendly relations with the local quarry-owners who were likely to make much use of the canal when it opened.

The Kennet and Avon Canal prospered until the Great Western Railway opened between London and Bristol, when its traffic ebbed away. Trying to compete with the railway, the canal company cut their tolls throughout the 1840s. It was not a sustainable strategy and in 1852, they sold the canal to the GWR.

Although the law required the railway company to keep it in a navigable condition, their approach to canal maintenance was extremely lax. Winter ice-breaking, for example, ceased in 1857 and when the masonry of the aqueducts fractured, it was patched with blue bricks. With ever diminishing traffic, in the mid-twentieth century the British Transport Commission pressed for the canal’s abandonment – a move which met with powerful opposition. In 1951 Lord Methuen had the Dundas Aqueduct designated as a Scheduled Ancient Monument – the first canal structure to enjoy such protection. Soon after, Kennet and Avon enthusiasts formed themselves into an Association – later a Trust – and began to restore the Canal.

In recent years, the Canal and River Trust has overseen repairs to both aqueducts, sourcing stone that is somewhat harder and of better quality than its 1790s counterpart, if much the same colour, and employing techniques with which Rennie and McIlquham would have been familiar. Numerous mason’s marks – geometric symbols identifying the stone’s source – are visible on each structure’s fabric. Above the Dundas Aqueduct’s central arch are two bronze plaques; one, facing south-west commemorates Charles Dundas, first chairman of the Canal Company; the other, facing north-east, celebrates John Thomas of Bristol, a grocer by occupation who, in a late-life career change, took responsibility for supervising the canal’s construction-in-progress after resident engineer Dudley Clark was dismissed for disregarding Rennie’s instructions about economical work-practice. Traces of the tram roads used to bring stone down from the quarries survive along the wooded paths around Murhill and Conkwell.

Caen Hill Locks

By David Newman

The spectacular descent of the Caen Hill flight of locks in Devizes is one of the most impressive sights along the Kennet and Avon (K&A) Canal system. Caen Hill is of particular interest due to its status as a scheduled ancient monument and its position as one of the top three tourist attractions in Wiltshire.

Just to the west of Devizes the canal changes level rapidly as it drops 237 feet in two miles through 29 locks to the Avon Valley. The most spectacular of those locks are the 16 which descend Caen Hill in one straight flight. The steep descent of the closely-packed locks and use of side-ponds creates an unusual and beautiful sight, not to mention a haven for plant and wildlife, attracting thousands of canal users and visitors every year. The locks are so close together that each pound has had to be extended sideways to give a reserve of water for lock operation.

A drawing of the Caen Hill Flight, taken from a folio of eight prints by Ron Durant. Collection of the National Waterways Museum

As far back as 1788 a ‘Western Canal’ was proposed to improve trade and communication links to towns such as Hungerford and Marlborough. The following year the engineers Barns, Simcock and Weston submitted a proposed route for this canal, although there were doubts about the adequacy of the water supply.

John Rennie found that there was in fact insufficient water available on the original Marlborough route and recommended that the canal should be built via Devizes. It is likely however that it was not only the lack of water that prompted this decision, the new route was in fact agreed as a result of lobbying by two Devizes MPs. In 1793 a further survey was conducted by John Rennie, and the route of the canal was altered to take a more southerly course through Devizes, Trowbridge and Newbury. The proposed route was accepted by the then ‘Kennet and Avon Canal Company’, chaired by Charles Dundas. Whilst Devizes gained economically from this decision, Marlborough did not, and as plans for a branch canal to Marlborough had also fallen through, the people of that town felt very hard done by.

They were ultimately placated however by an offer of reduced carriage tolls for goods dispatched to Marlborough.

It was John Rennie’s idea to climb the very steep Caen Hill, the last part of the 87-mile route of the Kennet and Avon Canal to be completed.

While the locks were under construction a horse drawn tramway provided a link between the canal at Foxhangers to Devizes. Its remains can still be seen in the towpath arches of all four bridges crossing the Devizes Flight over the canal.

It is November 20th, 1803, and John Rennie wrote: “There is good clay for bricks west of Scots House and there is an abundance on the face of Devizes Hill. I think 3½ or 4 million may be made at these places in the course of the ensuing season.”

Tramway Tunnel under the bridge at Marsh Lane and Lock 28

John Rennie’s navvies dug a brickyard to the south of the workings on the hillside between the towpath and the main road. Bricks for the Caen Hill Flight lock chambers were made from local gault clay. Two million bricks per year were supplied for the canal.

It is March 22nd, 1803, and following an inspection of the tramway, John Rennie commented: “The tramway in general is badly formed and the rails are badly laid. The sleepers are of wood but are too narrow. The waggons are badly formed and are so large and clumsy that they are a load for a horse themselves”.

When the flight of locks opened in 1810 barges were able to navigate the entire canal. The ‘toll’ per ton from London to Bath was £2 9s 6d, far cheaper than carriage by road. By 1818, seventy 60-ton barges were working on the canal, mostly carrying coal and stone. The journey from Bath to Newbury took an average of three and a half days. So, the canal was not only cheaper, but faster than road, vindicating Rennie’s recommendation to adopt the more challenging but more direct route.

For thirty years traffic on the canal grew and grew, with annual receipts between 1824 and 1839 in excess of £42,000 with a dividend of 3%.

The Decline of the Canal

As soon as the Great Western Railway (GWR) started operating from London to Bristol in 1841, the competition started affecting canal trade. Ironically much of the canal company’s profit in the late 1830’s came from transporting those self-same materials that were used to build the railway.

For the next ten years the canal company fought back against railway competition by reducing tolls and introducing its own fleet of barges.

Later, as matters got worse, there were staff cuts and wage reductions and canal traders increasingly turned to the railway, viewing it as a more economical means of transporting their goods.

Caen Hill Locks © Robert Coles, Canals and Rivers Trust

Railway Take-over and Operation

In 1852, the GWR obtained Parliamentary approval to take over the whole canal. The canal company shareholders were guaranteed an annual payment and the GWR promised to keep the canal in good repair and try to run it in a business-like way. However as profits gradually disappeared, they too began to cut staff and reduce repairs.

Lack of maintenance

During the years 1945 to 1948, the canal suffered even further decline due to a lack of maintenance and use although a number of smaller traders still used the waterway.

New management

As a consequence of railway nationalisation in 1948, the canal, including the Caen Hill Locks, came under the management of the Railway Executive and later under the Docks and Inland Waterways Executive. For a short while there was an upsurge in canal trading, when a number of enterprising businesses found cargoes to carry.

Closure

However, from the early 1950’s the DIWE effected a number of closures for repairs, and this made trading more and more difficult. These repairs were never satisfactorily carried out, and in 1955 the Transport Commission went to Parliament to close the canal.

Restoration and Upgrading of Caen Hill Lock Flight

A few years later and after considerable campaigning, the restoration of the Kennet and Avon Canal was started and the Kennet and Avon Canal Trust formed. After several decades of fundraising and hard work, the canal was re-opened by Her Majesty the Queen in August 1990.

A Back-Pumping Station opened in 1996. The pump house, built in character with the canal architecture is situated just below bridge 146 and down from Lock 22. As the name implies water is pumped back to the top of the flight by two 250kw pumps, with a maximum output of 32 million litres per day, the equivalent of one lockful every 11 minutes. The pumps are electrically driven and powered in part by 208 solar panels installed in 2012 at Foxhangers.

John Rennie’s Caen Hill, is now a very special place. After more than four decades of restoration, the canal is once again open for business, albeit business of a very different kind from John Rennie’s industrial origins. Pleasure boating, fishing, walking and cycling, the canal has something for everyone.

Caen Hill Back Pumping Station

Bruce Tunnel

By Nicolas Hopkins and David Newman

has long been known that the Great Western Railway drew water from the Kennet & Avon Canal in order to service the steam locomotives at Savernake Low Level Station situated immediately above the Bruce Tunnel. As far back as March 1988, it was reported in the Kennet & Avon Canal Trust’s magazine The “Butty” (issue 119) that K&ACT NB Jubilee had set forth eastwards from Wootton Rivers with an HTV camera crew on board. The approach to the Bruce tunnel was filmed and during transit of the tunnel shots were taken of the pipe through which water was pumped to the station above.

Michael Hawkins, a fifty-year-long serving member of the Canal & River Trust Operations team, also has memories of a pipe leading from the north side of the tunnel wall into the canal. Phil Collins from Burbage has known the tunnel and station for all his life, and he remembers playing in the tunnel as a child when, of course, the Summit Level would have been dry. Phil explains that having spoken to older friends in Burbage that worked at the station, it is remembered locally that there used to be another GWR water extraction point towards the eastern portal of the tunnel.

More recently, in 2023, the Operations team went to the Bruce Tunnel to investigate damage to the brick tunnel lining, assumed to have been caused by a boat strike. Gwilym Smith (Operations Team Leader) can be seen inspecting the damage in Fig 1. By this time, the pipe leading down into the water was missing. This inspection revealed the existence of a hitherto forgotten gallery which had been bricked up, 120m in from the west portal on the north side tunnel wall. The vertical channel can be seen in Fig 2 with a metal filter screen (Fig 3) at the base leading from the bed of the canal. The channel opens into a vaulted brickwork gallery where there are remains of pipework which had once connected the pump to canal water via the filter screen. Fig 4 shows the bottom rungs of a ladder, the end of a heavy-section beam and fill-in rubble supported by what appears to be two lengths of Brunel’s GWR wide-gauge rail – undoubted proof that this is a GWR installation making use of the gallery and shaft originally incorporated by John Rennie when the tunnel was built. Its purpose at the time was either for construction access or emergency escape during the build as no information can be found to indicate that this chamber was ever intended as an escape route for boatmen. Incidentally, it is not unreasonable to suggest that such a convenient source of water was the reason why GWR chose to build the station here.

Fig. 1
Fig. 2
Fig. 3
Fig. 4

Also visible are electrical conduits and wiring, maybe for lighting when maintaining the pump workings. Looking vertically up the shaft (Fig 5), the ladder, pipework, and supporting beam can be seen, showing that there is climbable access to the surface. Note the pump valves (Fig 6) and in close-up “GWR” can be seen cast into the valve body.

Savernake Low Level Station

In October 2022, I obtained permission to enter the old station site to search for the top of the shaft under the supervision of a Construction Manager from Network Rail Asset Protection department. He also carried out a buried services search for the station but without result.

Beforehand I had created a what3words waypoint at the base of the shaft inside the tunnel and used this to identify the point where I thought the shaft would exit above. We initially searched expecting to find a concrete capping over the top of the shaft but instead, we found a bricked-in doorway in the supporting wall of the north side cutting (Fig 7). A Permanent Way hut (Fig 8) is thought to have been built over the tunnel shaft entrance to house the steam pump mechanism. This little hut stood facing Savernake West signal box at the point where the branch line to Marlborough turned away from the main line. The end walls back and front were built in red brick (English bond) although the back wall is completely buried in the embankment. Part of the front was timber framed and boarded with vertical tongue-and-groove planks. Woodwork was cream with a brown door and brown gutter. The roof was of tarred black corrugated iron. Significantly, there was a slatted vent over the window.

The bricked-in doorway (Fig 7) is all that remains to be seen today.

Fig. 5
Fig. 6
Fig. 7
Fig. 8

Much of the correspondence relating to the waterway and water supply to the station carries the heading GWR Engineers Office (Canals) Bath. The subject of water supply to the station is of some significance in this correspondence due to the close proximity at this point of the Kennet and Avon canal which had opened in 1810. The coming of the railway was an ill fortune for the canal, and is well-chronicled elsewhere. Canal traffic had gradually declined and the K & A was taken over by the GWR from 1st July 1851.

The first item of significance is dated September 1877 and refers to the amount of water consumed at Savernake; other papers from October 1878 onwards refer to an alteration in the train timings on the Marlborough branch rendering it impossible for the branch engine to pump water at Savernake. The driver would remove the engine’s whistle, connecting a pipe and tying the whistle chain down. In this way steam would be available to drive the pump, though such an operation was notorious for its not inconsiderable use of steam from the locomotive boiler. This meant a light engine movement from Marlborough to Savernake and return, either before or at the termination of the day’s service. Understandably, the suggestion was made that a small boiler be fitted in the pump house at Savernake, thus saving the expense. The pump house itself was located on the north side of the bay platform and was fitted with two steam pumps, which remained in use until at least November 1936. Approval was then given for an electrically driven centrifugal pump to be installed at an estimated cost of £280. This operated automatically, presumably actuated by a float switch, whenever a certain volume of water was drained from the storage tank via the water columns.

Station water came from the canal for many years and where taps existed the standard ‘Not Drinking Water’ signs were located. An interruption in this supply is reported in July 1915 through the water level of the canal having dropped; this in turn was due to the pumps at Crofton having ceased working owing to a lack of coal. Crofton pumping station was a major factor in the supply of water to Savernake station. Water was also supplied by the GWR to the proprietor of Savernake Forest Hotel who in 1928 is mentioned as a Mr. Bain. Bearing in mind the doubtful quality of certain of the supplies obtained from Savernake it is interesting to speculate where this was obtained and what the hotel used it for. It can be seen from the sketch drawing, Fig 9, that at some time there was a plan to supply water from the pumping house to an adjacent cattle trough.

Fig. 9

Crofton Beam Engines

By Peter Turvey and Ian Broom

The Grade-1 listed summit pumping station at Crofton on the Kennet & Avon Canal dates from 1807-9 and is a unique survivor of a once-common feature of English canals. The site is a miniature industrial community, including workers’ cottages, a smithy for engine and canal maintenance and boiler feed water header pond.

Rennie’s Site Plan 1807 based on Boulton and Watt archives MS/3147/5/608

Not only does the engine house with its boiler house and water supply system survive largely as laid out by Rennie, it also contains one of its two original Boulton and Watt steam engines in full working order. Although modified in the 1840s to improve its efficiency, much of the engine is original. Regularly demonstrated by dedicated volunteers during the summer months, this surviving engine was at work by 1812 and is the oldest in the world still in its original engine house and capable of doing its original job of pumping one tonne of water into the canal on each power stroke.

Rennie had been Boulton & Watt’s London agent before setting up his own engineering consultancy business and was familiar with the use of steam power. However, a steam pumping station to supply the canal summit with water was not part of his original 1794 design for the Canal, He had eliminated the need for pumping by incorporating a 4 km (2 ½ mile) long tunnel to keep the canal at the level of the highest natural water supplies at Crofton. Rennie’s design was sound but expensive. The eminent engineer William Jessop was asked to review the scheme; one of the cost-saving proposals he made was eliminating the tunnel by raising the summit level through short flights of locks at Crofton and Wootton Rivers, and using a steam pumping engine to supply the summit. Jessop estimated that this would save £31,000 – a considerable sum in 1795 – and two years’ work. His proposals for this and other modifications to the canal were adopted.

Crofton Pumping Station, Canal Engine Pound and Lock 60 from the air

In September 1802 Rennie had bought a 36” cylinder Boulton & Watt engine, built in 1801 for the West India Dock Company but never used by them. In June 1807 Rennie reported that ‘the place for the engine house had been marked out and that the tunnels and shafts (to connect with the canal and water supplies) were now proceeding’. He prepared a drawing of the site and sent it to Boulton & Watt on 25 June with a request to send ‘the plan for the double engine house as they wish much to sink the shaft and begin the building’.

The engine house was nearly finished by April 1808 and in May, Thomas Pearson, Boulton & Watt’s engine erector arrived. The engine was at work by the spring of 1809 and the Canal opened in 1810. Rennie’s plan was for two engines, and at the end of 1809 the Canal Committee decided to order a second, larger and more powerful engine to complete the scheme. This engine, of 42” cylinder was ordered in January 1810 and incorporated a major design improvement – a cast iron beam instead of a wooden one. It took a while to install, key parts were still being ordered in October 1811, but were at work by 1812. Unfortunately the Canal Company was not quick to settle Boulton & Watt’s bills, who were not fully paid until January 1813.

The subsequent history of Crofton Pumping station is one of repairs, maintenance and modernisation. By the 1840s the Kennet & Avon Canal was suffering from competition from the newly-opened Great Western railway. Pumping at Crofton was a large cost, and the station was updated adopting the latest, high pressure steam engine technology from Cornwall, where engineers had developed highly efficient engines for mine pumping. In 1844-5 the 1812 engine was modified by the Cornish engineering firm Harveys of Hayle with many new parts and high-pressure steam boilers, raising the steam pressure from 4-5 psi to at least 20psi. The upgrade proved successful, and in 1846 the original 36”engine was replace by a new ‘Sims Combined’ Cornish engine also by Harveys. As part of the work, an extra boiler house was built and the original boiler house extended.

Cast-iron beam of the 1812 Boulton & Watt Engine at Crofton

The Great Western Railway took over the Canal in 1852 and further modifications were made over the following years, a new chimney in 1856, repairs to the 1812 engine after a major breakdown in 1896, new boilers in 1893 and 1903, a rebuilt boiler house roof in the early years of the 20th century and a major rebuild of the 1846 engine in 1905. Crofton kept steaming on through the first half of the 20th century as the canal declined; the end came in 1959 when the chimney became unsafe and was shortened by some 9m. This made it impossible to fire the boilers as there was not enough draught to make the boiler fires burn properly. But the station was not abandoned. There had been discussions about possible preservation, and Frank Wilmott, the station’s last engineman, was instructed to mothball the station rather than abandon it.

In 1962 the Kennet and Avon Canal Trust was formed with a view to reopening the canal. British Waterways, the then owners, had by this time installed electric pumps to feed the canal and had no further use for the pumping station and in 1968 the Trust purchased the site for 75 guineas. A group of enthusiasts including apprentices from Rolls Royce started the restoration work and in 1970 the late John Betjeman reopened the station and its working engines for the visiting public. Since the time Crofton and its engines has been lovingly maintained and operated by volunteers from all walks of life.

Pump Well and original section of Boulton & Watt engine pump rising main

References

C Ian Broom (2010) The Western Canal, Forerunner of the Kennet and Avon

Canal, The International Journal for the History of Engineering & Technology, 80:1, 1-21

https://doi.org/10.1179/175812109X12547331091749

C Ian Broom (2007) The History of Crofton Pumping Station on the

Kennet and Avon Canal, Transactions of the Newcomen Society, 77:2, 141-165,

https://doi.org/10.1179/175035207X204798

C Ian Broom, The Crofton Story, Wiltshire Archaeological & Natural History Society, Devizes, 2013 ISBN 978 0 947723 16 3

Illustrations: All copyright Kennet and Avon Canal Trust